Your location:  Home  >  Bearing News  >  World Bearing News
<<  Back

Acconia Windpower Signs a New 195 MW Contract in Brazil

Resource from:  ACCIONA Windpower Likes:130
Mar 24,2015
ACCIONA Windpower, the ACCIONA Group subsidiary dedicated to the design, manufacture and sale of wind turbines, has reached agreement with Atlantic Energias Renováveis and the British private equity firm Actis to supply 195 megawatts (MW) –sixty-five 3 MW turbines– for a wind power complex located in the State of Piauí (northest Brazil).The project, developed through a joint venture between Atlantic and Actis, one of Atlantic’s shareholders, consists of eight wind farms: Lagoa do Barro I-VII and Queimada Nova. With this contract, ACCIONA Windpower reaches 1,020 MW sold of its AW3000 wind turbine in Brazil, since it started marketing it in 2012. The model selected in this contract is the AW125/3000, which has a rotor diameter of 125 meters. It is designed to optimize energy capture on sites with medium-speed prevailing winds in the area where the complex will be installed. The turbines will be mounted on 120-meter-high concrete towers. The production associated with this project was awarded to Atlantic in the A-5 auction organized by the Brazilian Government in November 2014. Supply of the wind turbines will begin in 2017, with the aim of the complex becoming operational in the second semester of 2018.The agreement establishes that ACCIONA Windpower will operate and maintain the installation for 15 years. “We are very pleased with this new agreement with Atlantic, which highlights the confidence of major players in the Brazilian wind power sector in our turbine, and the suitability of our product to give the best response to the needs of wind power developers”, says ACCIONA Windpower Brasil Director Christiano Forman. Local components The main components of the wind turbines to be supplied under this contract will be manufactured in Brazil. The nacelles will be assembled in the new plant ACCIONA Windpower has opened in Simões Filho (Bahía) and the concrete towers will be assembled on site, with the segments manufactured in a company facility located nearby. The blades and other equipment will also be purchased in Brazil. This means that the company complies with the requirements regarding national production of components established by the BNDES (Brazilian National Development Bank) to finance the purchase of wind turbines under more favorable conditions than in the market.
(ACCIONA Windpower)
【CBCC News Statement】
1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"CBCC".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.

BRIEF INTRODUCTION

Cnbearing is the No.1 bearing inquiry system and information service in China, dedicated to helping all bearing users and sellers throughout the world.

Cnbearing is supported by China National Bearing Industry Association, whose operation online is charged by China Bearing Unisun Tech. Co., Ltd.

China Bearing Unisun Tech. Co., Ltd owns all the rights. Since 2000, over 3,000 companies have been registered and enjoyed the company' s complete skillful service, which ranking many aspects in bearing industry at home and abroad with the most authority practical devices in China.