Your location:  Home  >  Bearing News  >  World Bearing News
<<  Back

270 MW Lincs Offshore Wind Farm Gets Boost With ZephIR Lidar

Resource from:  Zephir Ltd. Likes:136
Apr 17,2015
ZephIR Lidar is pleased to announce that it has installed a turbine-mounted ZephIR DM wind lidar on the 270 MW Lincs Offshore Wind Farm. Located five miles off the Skegness coast, Lincs Wind Farm is a joint venture between Centrica Energy, Siemens Project Ventures and DONG Energy. It is anticipated that the installation of the lidar unit will help to identify opportunities where a possible improvement to production from the installed 75 Siemens 3.6 MW wind turbine generators can be achieved. “The effective operation of our renewable energy generating assets such as the Lincs Wind Farm is key,” said Martin Stanyon, Performance Manager at Centrica Energy, who are the operators of Lincs Offshore Wind Farm. “The turbine-mounted ZephIR DM, allows us to accurately measure the performance of each turbine on Lincs, easily identifying areas for increased production through O&M strategies such as corrected yaw misalignment.” ZephIR Dual Mode (DM) is a continuous wave wind lidar, installed on the nacelle of a turbine and uniquely provides rotor equivalent wind measurements out in advance of a wind turbine from just 10 metres, well within the blade induction zone, and as far as 300 metres. The circular scan from ZephIR DM provides a representative wind picture that the turbine sees, in contrast to more basic systems that provide only a pillar-box view on the approaching wind. Measurements are then typically used for the correction of yaw misalignment, turbine calibrations, End of Warranty inspections, power curve measurements (absolute and relative), R&D projects and full turbine control. The Dual Mode function also allows for ground-based installations in front of turbines onshore for further analysis. Lincs Offshore Wind Farm was officially opened by the Deputy Prime Minister Nick Clegg on 1 August 2013. Construction started in 2010 with first power achieved in August 2012 and the last of the Siemens 3.6 MW turbines lifted into place on Sunday 31 March 2013. The Centrica O&M team will use ZephIR DM as a permanent tool for the wind farm, to monitor and safeguard individual turbine performance and overall energy production. Ian Locker, Managing Director at ZephIR Lidar commented: “We are very pleased to see ZephIR wind lidar technology being adopted in to the core operational strategy of wind farms onshore, and with Lincs, offshore. Our customers tell us that they are seeing real production improvements through high-resolution advanced wind measurements delivered by ZephIR DM.”
(Zephir Ltd.)
【CBCC News Statement】
1.The news above mentioned with detailed source are from internet.We are trying our best to assure they are accurate ,timely and safe so as to let bearing users and sellers read more related info.However, it doesn't mean we agree with any point of view referred in above contents and we are not responsible for the authenticity. If you want to publish the news,please note the source and you will be legally responsible for the news published.
2.All news edited and translated by us are specially noted the source"CBCC".
3.For investors,please be cautious for all news.We don't bear any damage brought by late and inaccurate news.
4.If the news we published involves copyright of yours,just let us know.

BRIEF INTRODUCTION

Cnbearing is the No.1 bearing inquiry system and information service in China, dedicated to helping all bearing users and sellers throughout the world.

Cnbearing is supported by China National Bearing Industry Association, whose operation online is charged by China Bearing Unisun Tech. Co., Ltd.

China Bearing Unisun Tech. Co., Ltd owns all the rights. Since 2000, over 3,000 companies have been registered and enjoyed the company' s complete skillful service, which ranking many aspects in bearing industry at home and abroad with the most authority practical devices in China.